Laddar...

Getö Mine, No. 2, was likely only worked during the year 1918. There are no mining reports before or after that year.
Number of weeks worked in 1918: 40
Rock and ore extracted underground: 2,643 tons
Product suitable for concentration obtained: 612 tons
Source: Conny Eimar
Getö Mine No. 2 is located within the claim Yngengruvan No. 2. The claim was registered on 23 November 1912, and the owner was Getö Nya Gruv AB.
The shaft sinking probably started in 1917 and had reached a depth of 14.5 meters by 18 June. The mine is shown on the map of “Getö Stora Jernmalmsgrufva” from 1918 and was surveyed on 18 June 1917.